Can a week go by without something happening that involves Vermont Yankee?
Not this week, at least.
Wednesday afternoon, the Public Service Board will hold a hearing on whether Entergy Nuclear Vermont Yankee should cease operating the nuclear plant until it finds and fixes the tritium leak.
The hearing will also consider whether there is cause to revoke the plant’s certificate of public good and whether the company should be penalized for the radioactive leaks.
Meanwhile, down at the plant, a "remotely operated vehicle" continues its probe of a tunnel and drainpipes that have been found to leak.
According to Monday’s dispatch from Entergy, "The inspection will allow engineers to determine the source for the small amount of leakage remaining internal to the tunnel and develop additional remediation steps that can be taken to completely eliminate the leak. As previously reported, water coming from the pipe is not reaching the environment. The water is being collected in a sump for processing through plant systems as designed."
Does it help Yankee's case before the board that there's been progress in identifying the cause of the leak?
— Nancy Remsen
Labels: Public Service Board, Vermont Yankee